BNSF completes Drano Lake bridge replacement installation

(Source: The Columbian, September 14, 2020)

DRANO LAKE, Wash. — Eighteen days after being transferred to a barge and departing Vancouver, the newest bridge on the BNSF Railway’s Columbia River Gorge line is now installed in its new home, carrying trains across the entrance channel where Drano Lake connects to the river.

Full story: The Columbian

Tuesday, September 15, 2020
bentley@ble-t.org

http://www.ble-t.org/pr/news/headline.asp?id=67721

© 1997-2020 Brotherhood of Locomotive Engineers and Trainmen
http://www.ble-t.org