LIRR, Metro-North on track to meet PTC deadline

(Source: Railway Age, May 20, 2020)

NEW YORK The presidents of MTA Long Island Rail Road (LIRR) and MTA Metro-North Railroad have announced that Positive Train Control (PTC) has been activated on the majority of their tracks, and both railroads remain on pace to complete system-wide activation of PTC by the end of 2020 as required under a Federal legislation.

Full story: Railway Age

Friday, May 22, 2020
bentley@ble-t.org

http://www.ble-t.org/pr/news/headline.asp?id=64154

© 1997-2020 Brotherhood of Locomotive Engineers and Trainmen
http://www.ble-t.org