press release, September 19"> press release, September 19" />

7061 East Pleasant Valley Road, Independence, Ohio 44131 • (216) 241-2630 / Fax: (216) 241-6516

Membership
Benefits
News and Issues
Departments
Information
Secretary-Treasurer
Merchandise
Communications
FELA
Events
Links
User Info

DOT awards more than $74 million to further develop southeast high-speed rail corridor in Va.

(Source: U.S. Department of Transportation press release, September 19, 2012)

WASHINGTON, D.C. – U.S. Transportation Secretary Ray LaHood today awarded more than $74.8 million to the Commonwealth of Virginia to continue development of the Southeast High-Speed Rail Corridor. The funding will help improve passenger and freight rail service between Virginia and Washington, D.C. and reduce delays on the Virginia Rail Express (VRE) commuter service.

“The Southeast High-Speed Rail Corridor between Charlotte and Washington D.C. serves one of the fastest growing regions in the country, which is why it is critical to eliminate congestion points so that intercity passenger, freight and commuter rail can all run smoothly without delays,” said Secretary LaHood. “This is a great example of how federal, state and local governments are working with rail carriers to build capacity and improve service for the public.”

The project will build up to 11 miles of third track and related improvements from Arkendale in Stafford County to Powell's Creek in Prince William County, Va. The third track will provide the capacity needed for higher speed trains on the Southeast Corridor to operate without conflict from freight and commuter trains. On a daily basis, 40-50 freight trains, 10 Amtrak trains and 14 VRE trains operate over this segment, and the addition of a third track will allow for traffic to flow unimpeded. In addition to adding a third track, the project includes final design and improvements to the station at the Quantico Marine Base in Quantico, Va.

“The Washington, D.C. area transportation system has been plagued with delays as population in the area has increased and more commodities flow through the region,” said Federal Railroad Administrator Joseph C. Szabo. “Reducing congestion and adding capacity are two key outcomes we and our state partners in Virginia planned for in making this investment. Projects like this will make a real difference for passengers while maintaining our world class freight system. We are building a rail infrastructure for an America built to last.”

When completed, the Corridor will have have at least eight high-speed trains traveling at 110 mph between Charlotte, N.C. and Washington D.C. Travel time between Charlotte and Washington D.C. will be reduced by up to three hours, and travel time between Richmond and Washington D.C will be reduced by 35 minutes. The Southeast Corridor is one of five originally proposed high-speed passenger rail corridors designated by the U.S. Department of Transportation in 1992. It is part of an overall plan to extend service from the existing high-speed rail on the Boston to Washington Northeast Corridor to points in the Southeast. Future plans for the Southeast High-Speed Rail Corridor call for extending service from Charlotte to Atlanta.

The Federal Railroad Administration and its 32 state partners are making great progress on High-Speed and Intercity Passenger Rail projects across the country. With $10.1 billion in federal funding, states are moving forward with 153 projects, laying the foundation for a 21st century passenger rail network.

Tuesday, September 25, 2012

Like us on Facebook at
Facebook.com/BLETNational

Sign up for BLET News Flash Alerts

© 1997-2019 Brotherhood of Locomotive Engineers and Trainmen

 


Decertification Helpline
(216) 694-0240

Sign up for BLET
News Flash Alerts

DAILY HEADLINES

U.S. House votes to block rail tank cars of LNG
Will U.S. rail volumes take a hit from the proposed U.S. tariffs on China?
Facebook fishing trip video dooms rail worker’s FMLA claim
Conrail conductor alleges railroad attempted to interfere with medical care
CN to report Q2 2019 earnings on July 23
Canada’s crude by rail traffic jumps 40 percent
Mobile hesitates on backing coastal Amtrak return
Virgin Trains USA begins Orlando extension
Amtrak suspends service to and from Norfolk after NS coal train derailment
The Empire Builder: Still rolling at 90
RRB issues statements of service (Form BA-6)
RRB Q&A: Reporting events that can affect retirement benefits
Get the latest labor news from the Teamsters

More Headlines